Job description
Design-to-Installation Control
- Review and verify designer-issued IFC drawings, cable schedules, rack elevations, and BoQs for completeness and internal consistency before release to the installer
- Confirm installer's work-in-progress matches issued design; flag deviations, omissions, or field conditions that require designer clarification or formal design change
- Act as the formal channel for RFIs (Requests for Information) between installer and designer — logging, tracking, and closing them within schedule targets
Technical Compliance & QA/QC Oversight
- Monitor installer compliance with approved designs, project specifications, and relevant standards (TIA/ISO, BICSI, IATA/ICAO where applicable) — without personally performing installation
- Witness or audit inspection/test hold points (containment, cabling, termination, rack build) carried out by installer QA/QC teams
- Review installer-submitted test results (OTDR, copper certification, system test reports) for compliance against design pass/fail criteria; reject and require re-test where results are inadequate
Contractor & Vendor Management
- Track installer progress against the ICT schedule; identify slippage risk and escalate with technical justification
- Review and endorse (or reject) installer technical submittals, method statements, and material submittals before designer/client approval
- Coordinate factory acceptance testing (FAT) and site acceptance testing (SAT) logistics between vendor, designer, and installer, attending as the client/PM-side technical representative
Change & Risk Control
- Assess technical impact of site-driven variations or installer-proposed deviations, and route them through the designer for formal resolution
- Maintain a technical issues/risk log specific to ICT systems, feeding into the Delivery Manager's overall risk register
- Prevent scope/interpretation gaps between design intent and installed reality by maintaining a single source of technical truth (drawing register, RFI log, NCR log)
Testing & Commissioning Coordination
- Coordinate (not execute) integrated systems testing (IST) between installer, designer, and other disciplines (BHS, security, BMS)
- Verify commissioning documentation and test packs are complete, correctly signed off, and traceable before accepting handover from installer
- Confirm as-built drawings from the designer/installer accurately reflect the final installed condition
Reporting
- Produce technical status reports for the ICT Director: RFI/NCR status, test pass/fail rates, submittal turnaround, schedule risk
- Represent ICT technical status in site coordination meetings
Requirements
- Bachelor's degree in Telecommunications, Electrical/Electronics Engineering, or related field
- Minimum 7 years of experience in ICT infrastructure projects, with meaningful time spent in a client-side, PMC, or technical control/QA role (not purely design or purely installation)
- Strong working knowledge of structured cabling, network infrastructure, and airport-specific ICT systems (SCS, CCTV, access control, PA/VA, FIDS) — enough to critically review, not to design from scratch
- Experience managing RFI, NCR, and submittal review processes on capital projects
- Familiarity with TIA/ISO/BICSI cabling standards and relevant test/commissioning protocols
- Comfortable reading and cross-checking drawings, BoQs, and test reports without authoring them
- Fluent English is a must
